• UNSCHEDULED POWER INTERRUPTION (MARCH 18, 2023)

    Date: March 18, 2023 (Saturday) Time of interruption: 6:40 P.M. Time of restoration: To be determined Affected area: Brgys. Bobon,Managopaya, and Juanico, Banate Reason: 3 toppled poles hit by backhoe in Brgy. Managopaya, Banate We apologize for the inconvenience. For your information Read more

  • SCHEDULED POWER INTERRUPTION SA MARSO 22-25, 2023

    Pahibalo sa mga katapo-konsumidores nga may serye sang SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions amo ang mga masunod: PETSA, ORAS KAG APEKTADO NGA LUGAR MARSO 22, 2023 (MIYERKULES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon)SARA• Salcedo• Lanciola•… Read more

  • CANCELLED ANG SCHEDULED POWER INTERRUPTION SA MARSO 18, 2023 SA BANWA SANG LEMERY

    Pahibalo sa mga katapo-konsumidores nga GIN-CANCEL ang SCHEDULED POWER INTERRUPTION sang ILECO III sa MARSO 18, 2023 (SABADO), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) bangud sa pagahiwaton nga Annual Fiesta sa Brgy. San Jose, Lemery, Iloilo. Ang apektado nga lugar sang sini nga CANCELLED power interruption sa banwa sang LEMERY amo ang… Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • LOOK: ILECO III-THE FIRST EC WITH THE MOST NUMBER OF LINEMEN CERTIFIED AS COMPETENT BY TESDA FOR EPDLC-NCII IN VISAYAS

    Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more