• NGCP’s UNSCHEDULED POWER INTERRUPTION (UPDATE)

    DATE: April 28, 2023 (Friday)Time of interruption: 2:55 PMEstimated Time of power restoration: NOT YET DETERMINED Affected areas: Sara, Lemery, Ajuy, San Dionisio, Concepcion, Batad, Estancia, Balasan, Carles, Anilao, Banate, Barotac Viejo and San Rafael Cause of interruption: Over voltage of transmission line of NGCP We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (APRIL 28, 2023)

    Date: April 28, 2023 (Friday) Time of interruption: 12:39 PM Time of restoration: 12:43 PM Affected areas: Banate Substation Feeder 2 Cause of power interruption: Transient line fault We apologize for the inconvenience. For your information. Read more

  • Pahibalo sa tanan nga katapo-kunsomidor sang ILECO III

    https://web.facebook.com/NGCPph/posts/pfbid038FGkA3YhMsE9nez7EejR2gu5SnoZSeKA15hycVuRXtvdk3bJAfo4RvUd58J4u7wWl Read more

  • ENERGY SAVING TIP

    Mag-gamit sang electric fan sa baylo sang air conditioning system. Read more

  • REQUIREMENTS OF CHANGE OF NAME

    DECEASED MEMBER CONSUMER1. For Spouse Applicants• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III signedby Punong Barangay• Marriage Contract• Proof of Ownership – (e.g. deed of sale, affidavit ofheirship) (if available)2. For Legal Heirs• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III• Notarized Waiver of Rights stating that the othersuccessors are not after… Read more

  • ENERGY SAVING TIP

    Kinahanglan tinlu-an ang mga appliances para ma-preserba ang kapasidad sini. Read more

  • FEAST OF SAN JUAN DE BAUTISTA

    ILOILO III ELECTRIC COOPERATIVE, INC. joins “Saranhon” and “Banatenhon” in their celebration of Feast of San Juan De Bautista an Annual Town Fiesta, June 24, 2023 (Saturday). Happy Fiesta mga ka Member-Consumer-Owners! Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more