• UNSCHEDULED POWER INTERRUPTION (JUNE 12, 2022)

    Date: June 12, 2022 Time of interruption: 5:10 PM Time of restoration: 5:50 PM Affected area: San Dionisio, San Rafael, Iloilo Activity: Replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 12, 2022)

    Date: June 12, 2022 Time of interruption: 4:31 PM Time of restoration: 5:15 PM Affected area: Sitio Hacienda Rica, Badiang, Anilao, Iloilo Activity: Refusing primary cut-out We apologize for the inconvenience. For your information. Read more

  • ENERGY CONSERVATION TIPS!

    AIR CONDITIONING UNIT Buy an aircon with high Energy Efficiency. Ratio indicated in the yellow label. Change or clean your AC’s air filters regularly. Block the sun from overheating your home. Inside, use shades, blinds and drapes.Outside, use awnings, trees and shrubs. Repair leaky ducts to reduce heating and cooling costs. Decorate for a cooler… Read more

  • ENERGY SAVING TIP

    Patyon ang suga sa kwarto kung wala sang tawo. Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 29, 2023)

    Date: June 29, 2023 (Thursday) Time of interruption: 6:35 AM Time of restoration: 8:45 AM Affected area: Brgy. Bolhog and Brgy. Calangag, Batad, Iloilo Action taken: Repaired secondary bushing of distribution transformer We apologize for the inconvenience. For your information. Read more

  • FEAST OF SAN PEDRO DE APOSTOL

    ILOILO III ELECTRIC COOPERATIVE, INC. joins “Barotacnon” in celebration of their Feast of San Pedro de Apostol, an Annual Town Fiesta of Barotac Viejo, Iloilo. June 29, 2023 (Thursday) Happy Fiesta mga Ka-MCOs! Read more

  • EID’L ADHA

    ILOILO III ELECTRIC COOPERATIVE, INC. observes Eid’l Adha “Feast of Sacrifice”, June 28, 2023 Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more