• UNSCHEDULED POWER INTERRUPTION (FEBRUARY 1, 2023)

    Date: February 01, 2023 (Wednesday) Time of interruption: 2:00 PM Time of restoration: 3:10 PM Affected area: Poblacion, Anilao, Iloilo (portion) Activity: Installed correctional pole We apologize for the inconvenience. For your information. Read more

  • THERMAL SCANNING OF DISTRIBUTION LINES

    ILECO III Technical Team conducted Thermal scanning of Distribution Lines to determine hotspots of distribution lines and to reduce system loss today, January 31, 2023 (Tuesday). For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 31, 2023)

    Date: January 31, 2023 Time of interruption: 11:30 AM Time of restoration: 3:25 PM Affected area: Trinidad Village, Poblacion, Barotac Viejo, Iloilo Activity: Replaced rotten pole We apologize for the inconvenience. For your information. Read more

  • ENERGY SAVING TIP

    Kinahanglan tinlu-an ang mga appliances para ma-preserba ang kapasidad sini. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Pag-gamit sang highly resistive appliances sa tion sang off-peak (kon sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00PM tubtob 10:00PM. Read more

  • ENERGY SAVING TIP

    Pag-gamit sang energy efficient nga appliances kag pag-gamit sang mga LED bulbs. Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more