• UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 8, 2022)

    Date: September 8, 2022 Time of interruption: 7:21 PM Time of Restoration: 7:44 PM Affected Area: Binon-an, Alinsolong and Ban-Ban, Batad Activity: Inspection of line and replaced busted fuselink We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 8, 2022)

    Date: September 8, 2022 Time of interruption: 6:56 AM Time of Restoration: 9:15 AM Affected Area: Tabugon Proper and Tabugon Minor, Carles (Island) Activity: Inspection of line and replaced busted fuselink and change defective kWhr Meter We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 7, 2022)

    Date: September 7, 2022 Time of interruption: 7:05 PM Time of Restoration: 7:35 PM Affected Area: Sitio Cawayan Sulod, Cawayan, Carles Activity: Inspection of line and replaced busted fuselink We apologize for the inconvenience. For your information. Read more

  • FREQUENTLY ASKED QUESTIONS

    ANO ANG DAPAT UBRAHON KUNG MAY ARA NGA POWER INTERRUPTION SA AMON LUGAR? Read more

  • ENERGY SAVING TIP

    Pag-kontrol sang konsumo sang kuryente. Read more

  • PRESS RELEASE

    Pahibalo sa mga katapo-kunsumidores nga pwede makig-angot paagi sa pagtawag sa mga masunod nga Lifeline Program Hotline Numbers sang Energy Regulatory Commission (ERC) para sa inyo mga palamangkutanon kag iban pa nga concerns nahanungod sa Lifeline Rate Extension Act ukon Republic Act No. 11552 kag angImplementing Rules and Regulations sang nasambit nga layi. (02) 8689… Read more

  • ENERGY SAVING TIP

    Mag-gamit sang electric fan sa baylo sang air conditioning system. Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more