
POWER RATES
POWER ADVISORIES
Date: July 06, 2022 (Wednesday)Time of interruption: 12:51 PMTime of restoration: NOT YET DETERMINED Affected areas:LEMERY (ALL BARANGAYS)SARA:AlibayogApeloAranteBagaygayImprogoLabiganPreciosaSan LuisTentayVilla Hermosa Reason: Manual Load Dropping due to isolation of NGCP’s 138kV Negros-Panay Submarine Cable We apologize for the inconvenience. For your information. Read more
Date: July 06, 2022 (Wednesday)Time of interruption: 11:14 AMTime of restoration: NOT YET DETERMINED Affected areas: ANILAO, BANATE, BAROTAC VIEJO AND SAN RAFAEL Caused: Waiting for NGCP’s response We apologize for the inconvenience. For your information Read more
ILECO III is still coordinating with National Grid Corporation of the Philippines (NGCP) for total power restoration of franchise coverage. We apologize for the inconvenience. For your information. Read more
NEWS AND UPDATES
https://www.facebook.com/watch/live/?ref=watch_permalink&v=627386142826200 Read more
ILECO III conducted a benchmarking activity at Aklan Electric Cooperative, Inc. (AKELCO) on its Complaint Management System, GPS Tracking System for service vehicles and other best practices on August 03, 2023 (Thursday). AKELCO family headed by General Manager, Atty. Ariel B. Gepty, together with their Management Committee warmly welcomed ILECO III to their Main Office… Read more
Also in attendance were Ms. Christine Joy G. Hermano, ISD Manager, Mr. Alex A. Demandante, MSD Chief, Mr. Joel C. Datoon, BEA President and other ILECO III and BEA Officers. For your information. Read more
1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more
BIDS AND NOTICES
Procurement of 4X4 Pick Up Vehicle for Area Offices and Utility Van for Main Office Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loan, and Maintenance Use Read more