• MAY SCHEDULED PREVENTIVE MAINTENANCE ANG NGCP SA ENERO 7, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69 kV Sara-Estancia Transmission Line Section sa ENERO 07, 2023 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: 4:00 AM- 5:00 AM (1 ka oras ang kalawigon)KAG5:00 PM-… Read more

  • UNSHEDULED POWER INTERRUPTION (DECEMBER 27, 2022)

    Date: December 27, 2022 (Monday) Time of interruption: 10:42 AM Time of restoration: 11:52 AM Affected area: Sitio Piliwan, Luca, Ajuy, Iloilo Activity: installation of 25 KVA distribution transformer We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (DECEMBER 27, 2022)

    Date: December 27, 2022 Time of interruption : 6:05 AM Time restored : 6:50 AM Affected area : Sitio Nabitasan, Poblacion, Balasan, Iloilo Activity : Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • PRESS RELEASE

    Pahibalo sa mga katapo-konsumidor sang ILECO III nga yari ang detalye sang mga numero nga puwede ninyo matawgan o mahatagan sang mensahe nahanungod sa brownout sa ti-on sang aton nga palaabuton nga Barangay and Sangguniang Kabataan Elections 2023 (BSKE 2023). Makig-angot lang sa aton mga Technical Personnel nga na assigned sa inyo nga banwa para… Read more

  • LOOK: ILECO III NAGPATIGAYON SANG BLOOD-LETTING ACTIVITY KAUPOD ANG PHILIPPINE RED CROSS- ILOILO CHAPTER

    Kabahin sa pagsaulog sang National Cooperatives’ Month kag 37th Foundation Day Celebration, ang Iloilo III Electric Cooperative, Inc. (ILECO III ) kaupod ang Philippine Red Cross – Iloilo Chapter ang madinalag-on nga nagpatigayon sang Blood Letting Activity “Give blood, give plasma, share life, share often” sang Oktubre 25, 2023 (Miyerkules). May ara sang 74 ka… Read more

  • LOOK: HANDOG TSINELAS, GIFT GIVING AND FEEDING PROGRAM OF ILECO III AT OMIO ELEMENTARY SCHOOL

    In line with the celebration of ILECO III’s 37th Founding Anniversary and as part of its Corporate Social Responsibility (CSR) to the community, the cooperative successfully conducted the “Handog Tsinelas”,Gift Giving and Feeding Program for the learners of Omio Elementary School located at Brgy. Omio, Lemery, Iloilo on October 24, 2023. The purpose of this… Read more

  • FEAST OF SAN RAFAEL DE ARCHANGEL

    ILOILO III ELECTRIC COOPERATIVE, INC. join in the celebration of Feast of San Rafael de Archangel an Annual Municipal Town Fiesta of San Rafael, Iloilo, October 24, 2023. Happy Fiesta mga ka-MCOs! Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more