
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa OKTUBRE 12, 2024 (SABADO), 5:00 AM- 6:00 PM (13 ka oras ang kalawigon) para sa patigayunon nga preventive maintenance sang Sara Substation, pag-ilis sang poste kag steel pins kag clearing sang linya. Ang lugar nga apektado sang sini nga power interruption amo Read more
Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50 MVA Transformer 2 sa Dingle Substation sa OKTUBRE 20, 2024 (DOMINGO). Ang oras kag apektado nga lugar sang sini nga power interruption amo ang masunod: OKTUBRE 20, 2024 (DOMINGO) 6:00 AM- 6:00 PM Read more
Date: October 03, 2024 (Thursday) Time of interruption: 6:33 AM Estimated time of restoration: NOTE YET DETERMINED Affected areas: Bulak Sur and Alapasco, Batad, Iloilo Cause: Replacement of poles For your information. Read more
NEWS AND UPDATES
Keep your home clean at all times. Read more
GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Read more
ILOILO III ELECTRIC COOPERATIVE, INC. joins the National Consciousness Month 2023 with the theme, Sustainable and Responsible Energy Future: Fueling Hope, Lighting the Way. We should embrace the power of awareness this Energy Consciousness Month. Small changes in energy use lead to big impacts on our planet. Let’s illuminate a sustainable path forward together. #ILECO3ThisEnergyConsciousnessMonth#GreenerFuture#BrighterFutureForGenerationsToCome Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more