• MAY SCHEDULED PREVENTIVE MAINTENANCE ANG NGCP SA NOBYEMBRE 25, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga may SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Sara 69kV Metering Point sa NOBYEMBRE 25, 2023 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: NOBYEMBRE 25, 2023 (SABADO)8:00 AM- 5:00 PM(9 ka oras ang kalawigon)•… Read more

  • POWER RESTORATION IN BRGY. DAPDAPAN, LEMERY

    ILECO III Technical Team restored power in Brgy. Dapdapan, Lemery, Iloilo today, April 13, 2022 (Wednesday).For your information. Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • ENERGY SAVING TIP

    Switch to energy efficient appliances. Read more

  • BOLA PARA SA PAG-ASA

    As part of the cooperative’s wellness program, ILECO III conducted a Corporate Social Responsibility dubbed, “BOLA PARA SA PAG-ASA” that aims to foster harmonious relationship and strong bond with our valued MCOs, partner organizations and other stakeholders. The Friendship Basketball Game was organized between ILECO III Warriors and Brgy. Guinticgan All Star Basketball Team in… Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more