• RESCHEDULED POWER INTERRUPTION

    Pahibalo sa mga katapo-konsumidores nga ang PREVENTIVE MAINTENANCE sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Dingle-Natividad 69kV Line sa HUNYO 03, 2023 (SABADO) ang GIN-RESCHEDULE sa HUNYO 04, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: HUNYO 04, 2023 (DOMINGO)6:00 AM- 6:00 PM (12 ka… Read more

  • KANSELADO ANG ANNUAL PREVENTIVE MAINTENANCE SANG NGCP SA HUNYO 4, 2023

    Pahibalo sa mga katapo-konsumidores nga KANSELADO ang LOAD TRANSFER kag ANNUAL PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Panit-an 138/69kV 50MVA Transformer sa HUNYO 04, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang KANSELADO nga power interruption amo ang masunod: 5:00 AM- 7:00 AM (2 ka oras ang kalawigon)KAG4:00… Read more

  • ILECO III POWER ADVISORY: UNSCHEDULED POWER INTERRUPTION

    AS OF 4:30 PM, MAY 31, 2023 CAUSE: HEAVY RAIN AFFECTED SUBSTATION: SARA SUBSTATION FOR YOUR INFORMATION AND REFERENCE. Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • ENERGY SAVING TIP

    Switch to energy efficient appliances. Read more

  • BOLA PARA SA PAG-ASA

    As part of the cooperative’s wellness program, ILECO III conducted a Corporate Social Responsibility dubbed, “BOLA PARA SA PAG-ASA” that aims to foster harmonious relationship and strong bond with our valued MCOs, partner organizations and other stakeholders. The Friendship Basketball Game was organized between ILECO III Warriors and Brgy. Guinticgan All Star Basketball Team in… Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more