• POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa NOBYEMBRE 7, 2025 (BIYERNES), 5:00 AM- 7:30 AM (2 ka oras kag 30 minutos ang kalawigon) kag NOBYEMBRE 15, 2025 (SABADO), 4:00 PM – 6:00 PM (2 ka oras ang kalawigon) para sa patigayunon nga Load Transfer Read more

  • POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa OKTUBRE 28, 2025 (MARTES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-ilis sang poste kag pag-convert sang linya. Ang mga lugar nga apektado sang sini nga power interruption sa banwa sang SAN RAFAEL amo ang: • Bagacay• Calaigang• Read more

  • POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa OKTUBRE 26, 2025 (DOMINGO), 6:00 AM- 3:00 PM (9 ka oras ang kalawigon) para sa pag-ilis kag pag-transfer sang mga poste kag pag-clearing sang linya. Ang mga lugar nga apektado sang sini nga power interruption sa banwa sang AJUY amo ang mga Read more

  • LOOK: ILECO III CONDUCTED ON-SITE PRE-MEMBERSHIP SEMINAR FOR SITIO ELECTRIFICATION PROGRAM (SEP) RECIPIENTS IN DEL CASTILLO, SARA, ILOILO

    ILECO III personnel successfully conducted on-site Pre-Membership Seminar (PMS) to 16 recipients of 2023 Sitio Electrification Program (SEP) of Sitio Palaspason A, Del Castillo, Sara, Iloilo on March 01, 2024 (Friday). The said meeting was also attended by BAPA Fed Officer Leah Jabagat. The National Electrification Administration (NEA) appropriated budget to electrify twenty seven (27) Read more

  • Who’s the REMARKABLE woman that influences you the most?

    https://www.facebook.com/ILECO3/posts/pfbid02iNZ3mXEbHonR33M4WTTpj774qy1gtbm6U3Ug3nfscA1M5YJzahqUbnEGYa1ZcRfZl Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep Read more

  • 2024 NATIONAL WOMEN’S MONTH

    The ILOILO III ELECTRIC COOPERATIVE, INC. stands with all the women of today in celebrating the 2024 National Women’s Month with the Theme: “Lipunang Patas sa Bagong Pilipinas: Kakayahan ng Kababaihan, Patutunayan!”, March 1 – 31, 2024. In today’s modern world, women is power. They are leaders, innovators, and changemakers, shaping the course of history Read more

  • ITB 2407, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more

  • ITB 2406, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more

  • ITB 2405, S. 2024

    Invitation to Bid for the Design, Supply, Delivery, Installation, Testing and Commissioning of Three-Phase Submarine Line Cable from Brgy. Daculan, Estancia to Brgy. Manlot, Carles, from Brgy. Manlot to Brgy. Talingting, Carles and from Brgy. Punta Batuanan to Brgy. San Fernando, Carles, Iloilo (Turn Key) Read more