• UNSCHEDULED POWER INTERRUPTION (MAY 23, 2022)

    Date: May 23, 2022 (Monday) Time of interruption: 8:37 AM Time of restoration: 9:20 AM Affected areas: NHA Vilaage, Guinticgan, Carles, Iloilo Activity: Repaired secondary transformer jumper cut-off We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (MAY 23, 2022)

    Date: May 23, 2022 (Monday) Time of interruption: 7:10 AM Time of restoration: 8:20 AM Affected areas: Mamhut Sur and Mamhut Norte, Balasan, Iloilo Activity: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • ILECO III UNSCHEDULED POWER INTERRUPTION (MAY 22, 2022)

    Time of interruption: 8:39 PM Time restored: 10:30 PM Affected area: Portion of San Rafael (San Andres, San Florentino, Ilongbukid) Reason : Line fault due to the exposure of branch of tree on the primary line Activity: Clearing of line and re-fusing of primary cut-out Thank you for your patience and understanding. Read more

  • REQUIREMENTS FOR CHANGE OF NAME

    DECEASED MEMBER CONSUMER 1. For Spouse Applicants • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III signed by Punong Barangay • Marriage Contract • Proof of Ownership – (e.g. deed of sale, affidavit of heirship) (if available) 2. For Legal Heirs • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III •… Read more

  • SCHEDULE OF DUE DATES AND DISCONNECTION FOR THE MONTH OF APRIL 2024

    For your information. Read more

  • GRID ALERT STATUS FROM NGCP

    𝐆𝐑𝐈𝐃 𝐀𝐋𝐄𝐑𝐓 𝐒𝐓𝐀𝐓𝐔𝐒: Visayas grid status, 16 April 2024 𝐘𝐞𝐥𝐥𝐨𝐰 𝐚𝐥𝐞𝐫𝐭 2:00PM-4:00PM 6:00PM-7:00PM Available Capacity – 2,742MW Peak Demand – 2,440MW Twelve (12) power plants are on forced outage, while five (5) others are running on derated capacities, for a total of 676.5MW unavailable to the grid. A yellow alert is issued when the operating… Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more