• POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa NOBYEMBRE 7, 2025 (BIYERNES), 5:00 AM- 7:30 AM (2 ka oras kag 30 minutos ang kalawigon) kag NOBYEMBRE 15, 2025 (SABADO), 4:00 PM – 6:00 PM (2 ka oras ang kalawigon) para sa patigayunon nga Load Transfer Read more

  • POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa OKTUBRE 28, 2025 (MARTES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-ilis sang poste kag pag-convert sang linya. Ang mga lugar nga apektado sang sini nga power interruption sa banwa sang SAN RAFAEL amo ang: β€’ Bagacayβ€’ Calaigangβ€’ Read more

  • POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa OKTUBRE 26, 2025 (DOMINGO), 6:00 AM- 3:00 PM (9 ka oras ang kalawigon) para sa pag-ilis kag pag-transfer sang mga poste kag pag-clearing sang linya. Ang mga lugar nga apektado sang sini nga power interruption sa banwa sang AJUY amo ang mga Read more

  • GRID ALERT STATUS FROM NGCP

    π†π‘πˆπƒ 𝐀𝐋𝐄𝐑𝐓 𝐒𝐓𝐀𝐓𝐔𝐒: Visayas grid status, 16 April 2024 𝐘𝐞π₯π₯𝐨𝐰 𝐚π₯𝐞𝐫𝐭 2:00PM-4:00PM 6:00PM-7:00PM Available Capacity – 2,742MW Peak Demand – 2,440MW Twelve (12) power plants are on forced outage, while five (5) others are running on derated capacities, for a total of 676.5MW unavailable to the grid. A yellow alert is issued when the operating Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION – Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION – Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente Read more

  • LOOK: ILECO 3 gracing the Symbolic Energization of Sitio Electrification Program (SEP 2022) at Brgy. Nasapahan, Lemery, Iloilo, yesterday April 14, 2024.

    ILECO 3 employees headed by Atty. James G. Balsomo II, General Manager and Dir. Jowella S. Juarez, Board of Director of District II (Sara and Lemery) graced the program of Brgy. Nasapahan, Lemery on its Turn-Over Ceremony of the Sitio Electrification Program 2022 which it was awarded and given to 20 beneficiaries of the said Read more

  • Happy birthday to Atty. Janeene Depay-Colingan, Executive Director and General Manager of PHILRECA.

    Sending your way a bouquet of happiness…To wish you a very happy birthday! From ILECO III Family! Read more

  • ITB 2407, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more

  • ITB 2406, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more

  • ITB 2405, S. 2024

    Invitation to Bid for the Design, Supply, Delivery, Installation, Testing and Commissioning of Three-Phase Submarine Line Cable from Brgy. Daculan, Estancia to Brgy. Manlot, Carles, from Brgy. Manlot to Brgy. Talingting, Carles and from Brgy. Punta Batuanan to Brgy. San Fernando, Carles, Iloilo (Turn Key) Read more