
POWER RATES
POWER ADVISORIES
*Update on NGCP’s scheduled power interruption Power has been restored in Natividad Area Coverage Time of power restoration:Natividad Area Coverage: 6:06 PM We apologize for the inconvenience. Thank you for your understanding. Read more
ILECO III Technical personnel conducted reconnection of pulled out kWhr Meter and replaced meter base loose connection at Brgy. Hall, Caw-I, Batad today, October 15, 2022 (Saturday). Keep safe Warriors of Light For your information. Read more
*Update on NGCP’s unscheduled power interruption Power has been restored to all affected areas in our coverage. Time of power restoration as follows:Natividad Area Coverage: 3:13 a.m.Sara Area Coverage: 3:17 a.m.Panian Area Coverage: 3:17 a.m We apologize for the inconvenience. Thank you for your understanding. Read more
NEWS AND UPDATES
For everyone’s information NGCP may implement Manual Load Dropping (MLD) in the following areas today, 16 April, to maintain the integrity of the power system: LUZON 7:00PM – 8:00PM INEC (parts of Ilocos Norte) CAGELCO 2 (parts of Cagayan and Apayao) BATELEC 1 (parts of Batangas) VISAYAS 7:00PM-8:00PM CENECO (parts of Negros Occidental) NOCECO (parts… Read more
Pahibalo sa mga katapo-konsumidor nga may ara sang issuance ang National Grid Corporation of the Philippines o NGCP nga may Yellow Alert sa Visayas Grid bangud sa dose (12) ka mga planta ang nag forced shutdown sa Luzon Grid kag limitado ang supply sang kuryente sa lima (5) ka mga available nga mga planta. Basi… Read more
DECEASED MEMBER CONSUMER 1. For Spouse Applicants • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III signed by Punong Barangay • Marriage Contract • Proof of Ownership – (e.g. deed of sale, affidavit of heirship) (if available) 2. For Legal Heirs • Death Certificate of Member-Consumer/ Barangay Certification provided by ILECO III •… Read more
For your information. Read more
BIDS AND NOTICES
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Poles Read more