• UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 8, 2022)

    Date: September 8, 2022 Time of interruption: 6:56 AM Time of Restoration: 9:15 AM Affected Area: Tabugon Proper and Tabugon Minor, Carles (Island) Activity: Inspection of line and replaced busted fuselink and change defective kWhr Meter We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 7, 2022)

    Date: September 7, 2022 Time of interruption: 7:05 PM Time of Restoration: 7:35 PM Affected Area: Sitio Cawayan Sulod, Cawayan, Carles Activity: Inspection of line and replaced busted fuselink We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 7, 2022)

    Date: September 7, 2022 Time of interruption: 5:54 PM Time of Restoration: 6:46 PM Affected Area: Tupas St., Poblacion, Barotac Viejo Activity: Repair secondary inner jumper cut-off We apologize for the inconvenience. For your information. Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more