
POWER RATES
POWER ADVISORIES
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 – Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting Read more
NEWS AND UPDATES
Ka-MCO! Looking for ways to save energy and money at home? Take a look at these Energy Conservation Tips we have put together, they could help you in reducing your monthly bills. Read more
SEPTEMBER 27, 2024 (FRIDAY) OFFICE HOURS AT THE MAIN OFFICE AND AREA OFFICES STARTS AT 9:00 AM . THANK YOU FOR YOUR UNDERSTANDING AND COOPERATION. Read more
Matuod gid man bala ang tsismis nga ang isa ka Electric Cooperative ang nagapa-gusto lang sa pag-pasaka sang kuryente? Diri naton mahibaluan kung fixed bala ang Distribution, Supply and Metering System Charge (DSM) nga gina sukot sang isa ka Electric Cooperative sa aton mga katapo-kunsomidor. Iba ang may alam ka-MCO! Info is Power! Read more
BIDS AND NOTICES
Procurement of 4X4 Pick Up Vehicle for Area Offices and Utility Van for Main Office Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loan, and Maintenance Use Read more