• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 4, 2022)

    Date: November 4, 2022 Time of interruption: 5:40 AM Time of Restoration: 6:45 AM Affected Area: Nueva Sevilla, San Juan, Santiago and San Fernando, Barotac Viejo Activity: Inspection of primary line, replace burned cut-out tube and re-fusing of section analyzing cut-out We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA NOBYEMBRE 18, 21, 22 KAG 24, 2022 SA BANWA SANG SAN RAFAEL

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya.Ang petsa, oras kag lugar nga apektado sang sini nga power interruption sa banwa sang San Rafael amo ang masunod: NOBYEMBRE 18, 2022 (BIYERNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon)• San Dionisio, San Rafael NOBYEMBRE 21, 2022… Read more

  • UNSCHEDULED POWER INTERRUPTION(NOVEMBER 3, 2022)

    Date: November 3, 2022 Time of interruption: 5:48 PM Time of Restoration: 6:56 PM Affected Area: Proper, San Lucas, Barotac Viejo Reason/Activity: Line fault due to vegetation/ Clearing of lines and repaired secondary bushing of 15kVa transformer supply. We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • LOOK: ILECO III-THE FIRST EC WITH THE MOST NUMBER OF LINEMEN CERTIFIED AS COMPETENT BY TESDA FOR EPDLC-NCII IN VISAYAS

    Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more