• EMERGENCY POWER INTERRUPTION (JUNE 14, 2023)

    Date: June 14, 2023 Time of interruption: 9:55 AM Time of restoration: 12:25 AM Affected area: Sitio Mabangsapa, Poblacion, Ilawod, Sara, Iloilo Activity: Replaced rotten pole We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JUNE 14, 2023)

    Date: June 14, 2023 (Wednesday) Time of interruption: 5:00 AM Time of restoration: 7:45 AM Affected area: Poblacion, Ajuy, Iloilo Activity: Replaced distribution transformer We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA HUNYO 19, 2023 SA BANWA SANG CONCEPCION

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa HUNYO 19, 2023 (LUNES), 11:00 AM- 2:00 PM (3 ka oras ang kalawigon) para sa pag-construct sang Three-Phase Tapping Pole sa Brgy. Poblacion, Concepcion, Iloilo. Ang lugar nga apektado sang sini nga power interruption sa banwa sang CONCEPCION amo ang masunod:• Poblacion… Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • ENERGY SAVING TIP

    Dry your clothes and dishes naturally. Read more

  • HAPPY BIRTHDAY CONGRESSMAN TUPAS!

    HAPPY BIRTHDAY HON. RAUL C. TUPAS, Congressman, 5th District of Iloilo Province. From ILECO III Family! Read more

  • LOOK: ILECO III-THE FIRST EC WITH THE MOST NUMBER OF LINEMEN CERTIFIED AS COMPETENT BY TESDA FOR EPDLC-NCII IN VISAYAS

    Forty (40) out of 43 linemen of ILECO III had passed the TESDA competency assessment for Electric Power Distribution Line Construction NC II last June 6-9, 2023 at TESDA Accredited Assessment Center, Iloilo III Electric Cooperative, Inc., Brgy. Preciosa, Sara, Iloilo. The Assessment was conducted by TESDA Accredited Assessor, Engr. Rodel F. Anado of GUIMELCO… Read more