
POWER RATES
POWER ADVISORIES
Date: October 28, 2022 Time of interruption: 5:24 PM Time of Restoration: 6:48 PM Affected Area: Lawis, Balasan Reason/Activity: Line fault due to secondary jumper cut-off/ Repair secondary jumper cut-off and re-fusing We apologize for the inconvenience. For your information. (Photo is pixelated and distorted due to heavy rain) Read more
ILECO III Technical personnel repaired the secondary jumper of the transformer loose connection at Brgy. Botongon, Estancia today, October 28, 2022 (Friday). Keep safe Warriors of Light For your information. Read more
ILECO III Technical personnel conducted troubleshooting of Unscheduled Power Interruption at San Juan Crisostomo, Anilao today, October 28, 2022 (Friday). Keep safe Warriors of Light For your information. Read more
NEWS AND UPDATES
This meeting was conducted to inform the members of the status of the BAPA operation and update them of the programs and activities of the Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). This activity is made possible with the support of ILECO III Officers and… Read more
For your information. Read more
ILECO III conducted On-site Pre-Membership Seminar (PMS) participated by 35 attendees in Brgy. Tabu-an, Estancia, Iloilo on October 14, 2024 (Monday). The said meeting was attended by Punong Barangay Hon. Joy L. Salarozan and Dir. Lope O. Salmorin. This activity is made possible with the support of ILECO III BODs and Management Committee headed by… Read more
ILECO III conducted On-site Pre-Membership Seminar (PMS) participated by 29 attendees in Brgy. Gimamanay, Balasan, Iloilo on October 14, 2024 (Monday). The said meeting was attended by Dir. Lope O. Salmorin. This activity is made possible with the support of ILECO III BODs and Management Committee headed by our General Manager, Atty. James G. Balsomo… Read more
BIDS AND NOTICES
15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more
Procurement of Boom Truck Read more