• UNSCHEDULED POWER INTERRUPTION (MAY 11, 2022)

    Date: May 11, 2022 (Wednesday) Time of interruption: 11:56 AM Time of restoration: 12:48 PM Affected areas: Dela Peña and Lipata, Barotac Viejo, Iloilo Activity: Replaced damaged/burned pin type porcelain insulator We apologize for the inconvenience. For your information. Read more

  • EMERGENCY POWER INTERRUPTION (MAY 11, 2022)

    Date: May 11, 2022 (Wednesday) Time of interruption: 9:25 AM Time of restoration: 2:40 PM Affected area: Poblacion North East Zone, Lemery, Iloilo Activity: Replaced two (2) rotten poles We apologize for the inconvenience. For your information. Read more

  • EMERGENCY POWER INTERRUPTION (MAY 11, 2022)

    Date: May 11, 2022 (Wednesday) Time of interruption: 1:15 AM Estimated time of restoration: 2:00 PM Affected areas: All barangay of San Rafael, Iloilo Activity: Replacement of toppled pole We apologize for the inconvenience. For your information. Read more

  • ILECO III ENERGY SAVING TIP

    Patyon ang suga sa kwarto kung wala sang tawo. *A friendly reminder from ILECO III. Read more

  • IEC IN BRGY. ROJAS, AJUY

    ILECO III personnel conducted Information Education Campaign (IEC) Program to 85 MCOs in Brgy. Rojas, Ajuy, Iloilo on May 20, 2022 (Friday). *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • RE-SAGGING OF SECONDARY LINE IN ALAPASCO, BATAD

    ILECO III Technical Team conducts re-sagging of secondary line in Brgy. Alapasco, Batad, Iloilo on May 20, 2022 (Friday). For your information. Read more

  • ILECO III ENERGY SAVING TIP

    Pagsiguro sang maayo nga insulation sang mga connection sang kuryente sa balay. *A friendly reminder from ILECO III. Read more

  • ITB 2302, S. 2023

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loand, and Maintenance Use Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more