• SCHEDULED PREVENTINVE MAINTENANCE SANG NGPC SA HUNYO 4, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga LOAD TRANSFER kag ANNUAL PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Panit-an 138/69kV 50MVA Transformer sa HUNYO 04, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: 5:00 AM- 7:00 AM (2 ka oras ang kalawigon)KAG4:00… Read more

  • SCHEDULED PREVENTIVE MAINTENANCE SANG NGCP SA HUNYO 3, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga may SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Dingle-Natividad 69kV Line sa HUNYO 03, 2023 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: HUNYO 03, 2023 (SABADO)6:00 AM- 6:00 PM (12 ka oras ang kalawigon)•… Read more

  • UNSCHEDULED POWER INTERRUPTION (MAY 29, 2023)

    Date: May 29, 2023 Time of interruption: 8:18 AM Time of restoration: 11:24 AM Affected area: Sitio Minoro, Bancal, Carles, Iloilo Activity: Replaced damaged bare wire We apologize for the inconvenience. For your information. Read more

  • ILECO III ENERGY SAVING TIP

    Patyon ang suga sa kwarto kung wala sang tawo. *A friendly reminder from ILECO III. Read more

  • IEC IN BRGY. ROJAS, AJUY

    ILECO III personnel conducted Information Education Campaign (IEC) Program to 85 MCOs in Brgy. Rojas, Ajuy, Iloilo on May 20, 2022 (Friday). *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • RE-SAGGING OF SECONDARY LINE IN ALAPASCO, BATAD

    ILECO III Technical Team conducts re-sagging of secondary line in Brgy. Alapasco, Batad, Iloilo on May 20, 2022 (Friday). For your information. Read more

  • ILECO III ENERGY SAVING TIP

    Pagsiguro sang maayo nga insulation sang mga connection sang kuryente sa balay. *A friendly reminder from ILECO III. Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more