• UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 7, 2022)

    Date: September 7, 2022 Time of interruption: 5:54 PM Time of Restoration: 6:46 PM Affected Area: Tupas St., Poblacion, Barotac Viejo Activity: Repair secondary inner jumper cut-off We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 7, 2022)

    Date: September 7, 2022 Time of interruption: 4:53 PM Time of Restoration: 5:30 PM Affected Area: Cabilao Grande and Sitio Camendez, Bancal, Carles (BAPA) Activity: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 7, 2022)

    Date: September 7, 2022 Time of interruption: 12:50 PM Time of Restoration: 2:00 PM Affected Area: Crossing Alfe, Guinticgan, Carles Activity: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • ILECO III ENERGY SAVING TIP

    Patyon ang suga sa kwarto kung wala sang tawo. *A friendly reminder from ILECO III. Read more

  • IEC IN BRGY. ROJAS, AJUY

    ILECO III personnel conducted Information Education Campaign (IEC) Program to 85 MCOs in Brgy. Rojas, Ajuy, Iloilo on May 20, 2022 (Friday). *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • RE-SAGGING OF SECONDARY LINE IN ALAPASCO, BATAD

    ILECO III Technical Team conducts re-sagging of secondary line in Brgy. Alapasco, Batad, Iloilo on May 20, 2022 (Friday). For your information. Read more

  • ILECO III ENERGY SAVING TIP

    Pagsiguro sang maayo nga insulation sang mga connection sang kuryente sa balay. *A friendly reminder from ILECO III. Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more