• SUPPLEMENTAL POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga ang SCHEDULED PREVENTIVE MAINTENANCE kag LOAD TRANSFER sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69 kV Sara-Estancia Transmission Line Section sa HULYO 15, 2023 (SABADO) ang nagbag-o ang oras sa mga apektado nga lugar sa Pani-an Area Coverage. Ang oras kag apektado nga lugar sang sini power… Read more

  • LOOK: ILECO III Technical Team replaced damaged steel pole in Brgy. Nipa, Concepcion, Iloilo today, July 13, 2023 (Thursday)

    We apologize for the inconvenience. For your information. National Electrification Administration Read more

  • EMERGENCY POWER INTERRUPTION

    Date: July 13, 2023 (Thursday) Time of interruption: 9:00 AM Estimated time of power restoration: 5:00 PM Duration: 8 hours Affected areas: Brgy. Loong (portion) and Brgy. Nipa, Concepcion, Iloilo Activity: Replacement of damaged pole hit by unidentified vehicle We apologize for the inconvenience. For your information. Read more

  • ILECO III ENERGY SAVING TIP

    Patyon ang suga sa kwarto kung wala sang tawo. *A friendly reminder from ILECO III. Read more

  • IEC IN BRGY. ROJAS, AJUY

    ILECO III personnel conducted Information Education Campaign (IEC) Program to 85 MCOs in Brgy. Rojas, Ajuy, Iloilo on May 20, 2022 (Friday). *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • RE-SAGGING OF SECONDARY LINE IN ALAPASCO, BATAD

    ILECO III Technical Team conducts re-sagging of secondary line in Brgy. Alapasco, Batad, Iloilo on May 20, 2022 (Friday). For your information. Read more

  • ILECO III ENERGY SAVING TIP

    Pagsiguro sang maayo nga insulation sang mga connection sang kuryente sa balay. *A friendly reminder from ILECO III. Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more