
POWER RATES
POWER ADVISORIES
Date: September 18, 2024 Time of interruption: 9:05 AM Estimated time e of interruption: NOT YET DETERMINED Affected areas: Padios, Lanciola, Crespo, Bakabak and Salcedo, Sara, Iloilo Cause of power interruption: Clearing of lines For your information. Read more
Date: September 11, 2024 Time of interruption: 1:08 PM Time of power restoration: 2:03 PM Affected areas: Imbaulan, Gerongan, Omio, Bankal & San Antonio, Lemery, Iloilo Cause: Busted fuse link For your information. Read more
Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang ILECO III sa SETYEMBRE 11, 2024 (MIYERKULES), 6:00 AM- 12:00 NN (6 ka oras ang kalawigon) para sa patigayunon nga hotspot correction sa Feeder 3 Sara Substation. Ang lugar nga apektado sang sini nga power interruption sa banwa sang SARA amo ang: • Aguirre •… Read more
NEWS AND UPDATES
REFRIGERATOR Repair refrigerator door seals if you feel cold air around the closed door or if moisture is collecting. Clean the condenser tube regularly. Minimize door openings as much as possible. Cool air escapes every time the refrigerator is opened. Buy ref with Energy Efficient Factor and preferably one with an inventer technology.Replaced old refrigerators.… Read more
From ILECO III Family! Read more
1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro… Read more
The start of the actual preparations and exercises on the Basic Linemen Training Course (Week 3) were the following: 1. Pole hauling2. Hole digging3. Grounding4. Pole erection5. Guying6. Anchoring7. Pole climbing exercises8. Pole dressing9. Stringing10. Tensioning, Armouring, Tying Activities mentioned above were just the first part of the rigorous trainings of the trainees to equip… Read more
BIDS AND NOTICES
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Poles Read more