• UNSCHEDULED POWER INTERRUPTION

    Date: September 18, 2024 Time of interruption: 9:05 AM Estimated time e of interruption: NOT YET DETERMINED Affected areas: Padios, Lanciola, Crespo, Bakabak and Salcedo, Sara, Iloilo Cause of power interruption: Clearing of lines For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION

    Date: September 11, 2024 Time of interruption: 1:08 PM Time of power restoration: 2:03 PM Affected areas: Imbaulan, Gerongan, Omio, Bankal & San Antonio, Lemery, Iloilo Cause: Busted fuse link For your information. Read more

  • EMERGENCY POWER INTERRUPTION SA BANWA SANG SARA SA SETYEMBRE 11, 2024

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang ILECO III sa SETYEMBRE 11, 2024 (MIYERKULES), 6:00 AM- 12:00 NN (6 ka oras ang kalawigon) para sa patigayunon nga hotspot correction sa Feeder 3 Sara Substation. Ang lugar nga apektado sang sini nga power interruption sa banwa sang SARA amo ang: • Aguirre •… Read more

  • Power Rates for the Month of June 2022

    The minimal INCREASE for Residential Consumers for the Month of June 2022 compared to the previous month is due to the increase in Transmission Charge. The drastic increase of the said charge was triggered by 47.29% increase of Ancillary Service Charge from 2.9M PhP (April 2022 power bill) to 4.3M PhP (May 2022 power bill)… Read more

  • Father’s Day Special

    To honor our Dad/Tatay/Papa this Father’s Day, join our FATHER’S DAY SPECIAL and win exciting prizes! HOW TO JOIN:1. Share with us below your best photo with your father or father figure.2. Tag/Mention him.3. Tell us one special thing about him.4. And make sure to use #ILECO3FathersDay in your caption for your entry tobe officially counted. Five… Read more

  • SCHEDULE OF DUE DATES AND DISCONNECTION FOR THE MONTH OF JUNE 2022

    For your information. Read more

  • SENIOR CITIZEN DISCOUNT

    Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III: • Valid… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more