• SCHEDULED POWER INTERRUPTION SA BANWA SANG BANATE SA ABRIL 25

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-construct sang linya para sa Sitio Electrification Project (SEP). Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang BANATE amo ang masunod: ABRIL 25, 2024 (HUWEBES) 1:00 PM- 3:00 PM (2 ka oras ang kalawigon)… Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG SARA SA ABRIL 24

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-construct sang linya para sa Sitio Electrification Project (SEP). Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang SARA amo ang masunod: ABRIL 24, 2024 (MIYERKULES) 8:00 AM- 5:00 PM (9 ka oras ang kalawigon)… Read more

  • SCHEDULED PREVENTIVE MAINTENANCE SANG NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) ABRIL 21, 2024 (DOMINGO)

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50 MVA Transformer 1 sa Concepcion Substation kag ang ILECO III para sa pag-clearing sang linya, pag-relocate sang mga poste, pag-ilis sang steel pins kag pagpatigayon sang hot spot correction sa ABRIL 21, 2024… Read more

  • ILECO III “LOVE ON WHEELS” GOES TO BRGY. BACOLOD, BALASAN, ILOILO

    The roving community pantry of ILECO III “Love on Wheels” goes to Brgy. Bacolod, Balasan, Iloilo on June 15, 2022 (Wednesday). ILECO III prepared grocery items and packs of rice and generously extended assistance to one hundred forty five (145) member-consumer-owners (MCOs) of the said barangay. It was assisted by Dir. Jeo B. Bandojo, ISD… Read more

  • THE NEW MANAGER OF ILECO III

    For the information of our beloved Member-Consumer-Owners (MCOs) and Stakeholders, effective June 16, 2022 (Thursday), ILECO III has a new General Manager, Atty. James G. Balsomo II. Congratulations GM Balsomo! Read more

  • Power Rates for the Month of June 2022

    The minimal INCREASE for Residential Consumers for the Month of June 2022 compared to the previous month is due to the increase in Transmission Charge. The drastic increase of the said charge was triggered by 47.29% increase of Ancillary Service Charge from 2.9M PhP (April 2022 power bill) to 4.3M PhP (May 2022 power bill)… Read more

  • Father’s Day Special

    To honor our Dad/Tatay/Papa this Father’s Day, join our FATHER’S DAY SPECIAL and win exciting prizes! HOW TO JOIN:1. Share with us below your best photo with your father or father figure.2. Tag/Mention him.3. Tell us one special thing about him.4. And make sure to use #ILECO3FathersDay in your caption for your entry tobe officially counted. Five… Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more