• UNSCHEDULED POWER INTERRUPTION (AUGUST 16, 2023)

    Date: August 16, 2023 (Wednesday) Time of interruption: 7:12 PM Time of restoration: 9:26 PM Affected areas: Zaragosa, Cabalic, Quiasan Lopez, Salvacion, Batuan, Bacolod and Dolores, Balasan Action Taken: Inspection of line and replaced damaged insulator due to animal contact on our distribution line. We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 16, 2023)

    Date: August 16, 2023 (Wednesday) Time of interruption: 8:00 PM Time of restoration: 8:55 PM Affected areas: Puerto Princesa and San Fernando, Barotac Viejo Action Taken: Inspection of line and replaced busted fuse link due to severe heavy rain and lightning surge We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 16, 2023)

    Date: August 16, 2023 (Wednesday) Time of interruption: 8:37 PM Time of restoration: 9:15 PM Affected areas: Sta. Rita, Anilao Action Taken: Inspection of line and replaced busted fuse link due to severe heavy rain and lightning surge We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIPS

    1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep… Read more

  • IEC PROGRAM AND BAPA GENERAL ASSEMBLY IN SITIO HAMBAD, VISTA ALEGRE, BAROTAC VIEJO

    ILECO III personnel conducted Information Education Campaign (IEC) Program and BAPA General Assembly in Sitio Hambad, Vista Alegre, Barotac Viejo, Iloilo attended by 75 MCOs on June 17, 2022 (Friday). For your information. *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • ILECO III WARMLY WELCOMES THE NEW GENERAL MANAGER

    Effective June 16, 2022, ILECO III installs new General Manager, Atty. James G. Balsomo II. ILECO III Officers, Management and Employees warmly welcome GM Balsomo as part of the family. GM Balsomo shares his insights and words of wisdom during the program and looks forward in working with the entire ILECO III workforce to achieve… Read more

  • ILECO III “LOVE ON WHEELS” GOES TO BRGY. BACOLOD, BALASAN, ILOILO

    The roving community pantry of ILECO III “Love on Wheels” goes to Brgy. Bacolod, Balasan, Iloilo on June 15, 2022 (Wednesday). ILECO III prepared grocery items and packs of rice and generously extended assistance to one hundred forty five (145) member-consumer-owners (MCOs) of the said barangay. It was assisted by Dir. Jeo B. Bandojo, ISD… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more