• POWER RESTORATION UPDATE

    As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 –… Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION (MARCH 1, 2024 UPDATE as of 11:30 PM)

    With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM… Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION (MARCH 1, 2024 UPDATE as of 10:12 PM)

    With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting… Read more

  • FEAST OF SAN JUAN DE BAUTISTA

    ILOILO III ELECTRIC COOPERATIVE, INC. celebrates with Saranhon and Banatenhon for their celebration of Feast of San Juan de Bautista an Annual Town Fiesta, June 24, 2022. Read more

  • IEC AND BAPA RE-ORGANIZATION IN BULAK SUR, BATAD

    ILECO III personnel conducted Information Education Campaign (IEC) Program and BAPA Re-Organization in Bulak Sur, Batad, Iloilo attended by 65 MCOs on June 22, 2022 (Wednesday). For your information. *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • ILECO III ENERGY SAVING TIP

    Pag-gamit sang natural light sa baylo sang mga suga. *A friendly reminder from ILECO III. Read more

  • SARADO ANG OPISINA SANG ILECO III MAIN OFFICE, MCO EXPRESS LANE BOOTH KAG SARA AREA OFFICE SA HUNYO 24, 2022

    Pahibalo sa mga katapo-konsumidores nga ang HUNYO 24, 2022 (BIYERNES) ang gina-obserba nga SPECIAL NON-WORKING HOLIDAY sa banwa sang SARA para sa pag-selebrar sang KAPISTAHAN NI SAN JUAN BAUTISTA (Feast Day of St. John the Baptist). Bangud sini, SARADO ang OPISINA sang ILECO III MAIN OFFICE, MCO Express Lane Booth kag SARA AREA OFFICE. Para… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more