• POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya kag pagpatigayon sang iban pa nga technical activities. Ang oras kag lugar nga apektado sang sini nga power interruption sa banwa sang CARLES amo ang mga masunod: AGOSTO 16, 2026 (DOMINGO) 8:00 AM- 5:00 PM (9 ka oras… Read more

  • NGCP EMERGENCY POWER ADVISORY

    What: Load Shedding due to NGCP’s Manual Load Drop Date: August 05, 2026 (Wednesday) Time of power interruption: 6:25 PM Time of power restoration: 7:47 PM Areas Affected : Balasan Substation – Feeder 2 Municipality of Balasan Municipality of Carles Cause of power interruption: Manual Load Drop (MLD) of NGCP to maintain the integrity of… Read more

  • NGCP EMERGENCY POWER ADVISORY

    What: Load Shedding due to NGCP’s Manual Load Drop Date: August 05, 2026 (Wednesday) Time of power interruption: 4:38 PM Time of power restoration: 6:02 PM Areas Affected : Sara Substation Sara Feeder 3 Sara: Apologista (Portion), Bakabak, Crespo, Ferraris, Gildore (Portion), Lanciola, Padios, Poblacion Ilawod (Portion), Salcedo, Zerrudo Concepcion: Calamigan (Portion) Cause of power… Read more

  • FOLLOW AND LIKE THE ILECO III OFFICIAL FACEBOOK PAGE

    Please follow and like the official Facebook page of ILECO III to know the latest power advisories, coop activities and other concerns related to electric service. https://www.facebook.com/ILECO3/ Thank you! Read more

  • IEC AND BAPA MEETING IN CULOB, ANILAO

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Meeting in Culob, Anilao, Iloilo with 68 attendees on July 13, 2022 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part of ILECO… Read more

  • ILECO III POWER AND COMPOSITION OF RATES FOR THE MONTH OF JULY 2022

    POWER RATES The INCREASE for the month of JULY 2022 compared to the previous month is due to the increase in generation cost. The said increase is due to the increase of prices in the Wholesale Electricity Spot Market (WESM) and coal based power suppliers. WESM prices climbed by P3.9649 per kWh because of the… Read more

  • Guide on how to schedule your Pre-Membership Seminar

    Link: https://docs.google.com/…/1FAIpQLSfTZZuZAqcjNk…/viewform Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more

  • ITB 2407, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more

  • ITB 2406, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more