• RECONNECTION OF PULL OUT KWHR METER AND REPLACED METER BASE LOOSE CONNECTION IN BATAD

    ILECO III Technical personnel conducted reconnection of pulled out kWhr Meter and replaced meter base loose connection at Brgy. Hall, Caw-I, Batad today, October 15, 2022 (Saturday). Keep safe Warriors of Light For your information. Read more

  • ILECO III POWER ADVISORY (OCTOBER 15, 2022)

    *Update on NGCP’s unscheduled power interruption Power has been restored to all affected areas in our coverage. Time of power restoration as follows:Natividad Area Coverage: 3:13 a.m.Sara Area Coverage: 3:17 a.m.Panian Area Coverage: 3:17 a.m We apologize for the inconvenience. Thank you for your understanding. Read more

  • ILECO III POWER ADVISORY (OCTOBER 15, 2022)

    What: UNSCHEDULED POWER INTERRUPTION of NATIONAL GRID CORP. OF THE PHILS. (NGCP)Time of Interruption: 12:59 a.m.Estimated Time of Power Restoration: Not yet determinedCause of Interruption: To be determined by NGCPAffected Areas: Municipalities of Anilao, Banate, Barotac Viejo, San Rafael, Ajuy, Sara, Lemery, San Dionisio, Concepcion, Batad, Estancia, Balasan, Carles (entire Panay Island) Our Technical Team… Read more

  • FOLLOW AND LIKE THE ILECO III OFFICIAL FACEBOOK PAGE

    Please follow and like the official Facebook page of ILECO III to know the latest power advisories, coop activities and other concerns related to electric service. https://www.facebook.com/ILECO3/ Thank you! Read more

  • IEC AND BAPA MEETING IN CULOB, ANILAO

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Meeting in Culob, Anilao, Iloilo with 68 attendees on July 13, 2022 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part of ILECO… Read more

  • ILECO III POWER AND COMPOSITION OF RATES FOR THE MONTH OF JULY 2022

    POWER RATES The INCREASE for the month of JULY 2022 compared to the previous month is due to the increase in generation cost. The said increase is due to the increase of prices in the Wholesale Electricity Spot Market (WESM) and coal based power suppliers. WESM prices climbed by P3.9649 per kWh because of the… Read more

  • Guide on how to schedule your Pre-Membership Seminar

    Link: https://docs.google.com/…/1FAIpQLSfTZZuZAqcjNk…/viewform Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more