• UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 13, 2022)

    Date: September 13, 2022 Time of interruption: 3:35 PM Time of Restoration: 4:45 PM Affected Area: Area from Dugman – Canas, San Dionisio Activity: Inspection of line and replaced fuselink We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 13, 2022)

    Date: September 13, 2022 Time of interruption: 3:35 PM Time of Restoration: 4:56 PM Affected Area: Sitio Lampuyang and Sitio Danmar, Sitio Puros and Sitio Baculod, Libertad, Banate Activity: Inspection and clearing of lines due to vegetation. We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 12, 2022)

    Date: September 12, 2022 Time of interruption: 9:38 AM Time of Restoration: 5:00 PM Affected Area: Brgy. Moto, San Dionisio Activity: Replacement and relocation of rotten poles (2) structure. Installation and rehabilitation of SDI and kWhr Meter in cooperation with our third party contractor (NIGSECO). We apologize for the inconvenience. For your information. Read more

  • FOLLOW AND LIKE THE ILECO III OFFICIAL FACEBOOK PAGE

    Please follow and like the official Facebook page of ILECO III to know the latest power advisories, coop activities and other concerns related to electric service. https://www.facebook.com/ILECO3/ Thank you! Read more

  • IEC AND BAPA MEETING IN CULOB, ANILAO

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Meeting in Culob, Anilao, Iloilo with 68 attendees on July 13, 2022 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part of ILECO… Read more

  • ILECO III POWER AND COMPOSITION OF RATES FOR THE MONTH OF JULY 2022

    POWER RATES The INCREASE for the month of JULY 2022 compared to the previous month is due to the increase in generation cost. The said increase is due to the increase of prices in the Wholesale Electricity Spot Market (WESM) and coal based power suppliers. WESM prices climbed by P3.9649 per kWh because of the… Read more

  • Guide on how to schedule your Pre-Membership Seminar

    Link: https://docs.google.com/…/1FAIpQLSfTZZuZAqcjNk…/viewform Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more