
POWER RATES
POWER ADVISORIES
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 –… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM… Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting… Read more
NEWS AND UPDATES
ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Badiang, Anilao, Iloilo with 84 attendees on July 19, 2022 (Tuesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more
ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Bagacay, San Dionisio, Iloilo with 64 attendees on July 20, 2022 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is… Read more
BIDS AND NOTICES
Refurbishment of Roofing, Glass Counters and Repainting of Sara Area Office. Read more
Procurement and Supply of Six (6) Units Service Vehicle for Maintenance Use in Area Offices. Read more
Procurement of Materials for Maintenance, Rehabilitation, Revamp of Lines and Capital Expenditures Read more