• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 16, 2022)

    Date: November 16, 2022 Time of interruption: 3:50 PM Time of Restoration: 4:20 PM Cause of interruption: Line fault due to lightning surge, gusty wind and heavy rain. Affected areas: Seaside Gasoline Station, Estancia (Private Transformer) We apologize for the inconvenience. For your information. Read more

  • Update on Unscheduled Power Interruption on Sara Feeder 1

    Time Restored: 7:18 PM Cause of Interruption: Line fault due to vegetation (Coconut Tree was leaning on our Primary Line located at Brgy. Devera, Sara. Thank you for your understanding. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 16, 2022)

    Date: November 16, 2022Time of interruption: 4:47 PMTime of Restoration: NOT YET DETERMINED Cause of interruption: Line fault due to bad weatherAffected areas:SAN DIONISIO – All barangaysSARA (portion)CONCEPCION- Aglosong Our Maintenance Team is currently conducting inspection of lines. We apologize for the inconvenience. For your information. Read more

  • How to pay you bills using GCash Account?

    Read more

  • IEC AND BAPA ASSEMBLY IN SAN DIONISIO, SAN RAFAEL

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in San Dionisio, San Rafael, Iloilo with 37 attendees on July 19, 2022 (Tuesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more

  • IEC AND BAPA ASSEMBLY MEETING IN NHA VILLAGE, BADIANG, ANILAO

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Badiang, Anilao, Iloilo with 84 attendees on July 19, 2022 (Tuesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more

  • IEC AND BAPA ASSEMBLY IN NHA VILLAGE, BAGACAY, SAN DIONISIO

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Bagacay, San Dionisio, Iloilo with 64 attendees on July 20, 2022 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more