• UNSCHEDULED POWER INTERRUPTION (MAY 2, 2023)

    Date: May 02, 2023 Time of interruption: 12:56 PM Time of restoration: 2:37 PM Affected area: Sitio Tuong, Pantalan, Carles, Iloilo Activity: Repaired secondary neutral jumper cut-off We apologize for the inconvenience. For your information. Read more

  • POWER ADVISORY

    NAHANUNGOD SA NAGA LAPTA NGA MESSAGE SA ATON NGA FB MESSENGER  Read more

  • POWER ADVISORY UPDATE as of 12:00 p.m., April 30, 2023

    Sa subong nga ti-on ang TANAN nga feeders sang mga masunod nga substations ang aton na nga na-energized: Sara Substation Ajuy Substation Banate Substation Balasan Substation Daan Banwa Substation Barotac Viejo Substation Ang aton nga mga feeders ang 100% energized na sa kabilugan nga coverage sang ILECO III. Sa liwat, ang mga nag-kalatabo nga shutdown… Read more

  • How to pay you bills using GCash Account?

    Read more

  • IEC AND BAPA ASSEMBLY IN SAN DIONISIO, SAN RAFAEL

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in San Dionisio, San Rafael, Iloilo with 37 attendees on July 19, 2022 (Tuesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more

  • IEC AND BAPA ASSEMBLY MEETING IN NHA VILLAGE, BADIANG, ANILAO

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Badiang, Anilao, Iloilo with 84 attendees on July 19, 2022 (Tuesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more

  • IEC AND BAPA ASSEMBLY IN NHA VILLAGE, BAGACAY, SAN DIONISIO

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Bagacay, San Dionisio, Iloilo with 64 attendees on July 20, 2022 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more