• UNSCHEDULED POWER INTERRUPTION (APRIL 25, 2023)

    Date: April 25, 2023 Time of interruption: 5:55 AM Time of restoration: 6:15 AM Affected areas: Brgy. Caw-i (portion) and Cabagohan, Iloilo Activity: Inspection of Three-Phase Line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA ABRIL 28, 2023 SA BRGY. DEL CASTILLO, SARA

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa ABRIL 28, 2023 (BIYERNES), 8:00 AM-5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga conversion sang Open Secondary pakadto sa Single Phase Line sa Brgy. Del Castillo, Sara, Iloilo. Ang apektado nga lugar sang sini nga power interruption amo ang:•… Read more

  • SCHEDULED POWER INTERRUPTION SA MAYO 6, 2023 SA BANWA SANG BANATE

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa MAYO 06, 2023 (SABADO), 8:00 AM-5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga conversion sang linya halin Vee- Phase Line pakadto sa Three-Phase kag Vee-Phase para sa pag-tap sang National Housing Authority (NHA) sa Brgy. Carmelo, Banate, Iloilo. Ang… Read more

  • ENERGY CONSERVATION TIPS!

    AIR CONDITIONING UNIT Buy an aircon with high Energy Efficiency. Ratio indicated in the yellow label. Change or clean your AC’s air filters regularly. Block the sun from overheating your home. Inside, use shades, blinds and drapes.Outside, use awnings, trees and shrubs. Repair leaky ducts to reduce heating and cooling costs. Decorate for a cooler… Read more

  • INDIVIDUAL PROMPT PAYORS FOR JULY 2022 BILLING

    Thank you to our beloved Member-Consumer-Owners (MCOs) for paying your bills promptly. Keep safe always. *Masks were removed for documentation purposes only. #1ECMCOMovement#ParaSaOneECMCOMovement#ILECO3ServiceBeyondElectricity Read more

  • IEC AND BAPA ASSEMBLY IN NHA VILLAGE, TIPACLA, AJUY

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in NHA Village, Tipacla, Ajuy, Iloilo with 34 attendees on August 04, 2022 (Thursday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more

  • IEC AND BAPA ASSEMBLY IN SITIO DAGA, PROGRESO, AJUY

    ILECO III personnel conducted Information Education Campaign (IEC) and BAPA Assembly in Sitio Daga, Progreso, Ajuy, Iloilo with 55 attendees on August 03, 2022 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part… Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more