• UNSCHEDULED POWER INTERRUPTION (OCTOBER 29, 2022)

    Date: October 29, 2022 Time of interruption: 9:41 AM Time of Restoration: 10:45 AM Affected Area: Ajuy Substation (Feeder 2) AJUY• Adcadarao• Agbobolo• Badiangan• Barrido• Bato Biasong• Bay-ang• Central• Culasi• Lanjagan PORTION• Luca• Malayu-an• Mangorocoro• Nasidman• Pantalan nabaye• Pedada• Pili• Pinantan Diel• Pinantan Elizalde• Pinay Espinosa• Poblacion• Progreso• Punta Buri• San Antonio• Santo Rosario• Tagubanhan•… Read more

  • UNSCHEDULED POWER INTERRUPTION (OCTOBER 29, 2022)

    Date: October 29, 2022 Time of interruption: 4:00 AM Time of Restoration: 10:00 AM Affected Area: San Juan, San Roque, Santiago, San Fernando, Barotac Viejo Reason/Activity: Line fault due to vegetation on Three (3) Phase Line/ Inspection and clearing of lines. We apologize for the inconvenience. For your information. Read more

  • INSPECTION AND TROUBLESHOOTING OF DAMAGE OF AJUY SUBSTATION FEEER 1 AND 2 TRIP OFFS

    ILECO III Technical personnel conducted inspection and troubleshooting of damage of Ajuy Substation Feeder 1 and 2 trip offs. The unscheduled power interruption was due to vegetation contact in our primary lines caused by “Typhoon Paeng (Nalgae)” today, October 29, 2022 (Saturday). Keep safe Warriors of Light For your information. Read more

  • ILECO III “LOVE ON WHEELS” GOES TO SITIO BALANTAK, SAN JOSE, LEMERY

    In line with the celebration of 13th National Electrification Awareness Month (NEAM), the roving community pantry of ILECO III “Love on Wheels” was conducted today, August 19, 2022 (Friday) in Sitio Balantak, San Jose, Lemery, Iloilo. ILECO III prepared grocery items and snacks and extended assistance to twenty (20) BAPA members of the said recipient… Read more

  • Power Rates for the Month of August 2022

    The INCREASE for the month of August 2022 compared to the previous month is due to the increase of all charges (includes generation, transmission, system loss and lifeline subsidy). The increase in generation is due to the increased charges from Independent Power Producers (IPPs) and the Wholesale Electricity Spot Market (WESM). WESM charges increased by… Read more

  • HAPPY BIRTHDAY NEA ADMIN JUANEZA!

    HAPPY BIRTHDAY NEA ADMINISTRATOR EMMANUEL P. JUANEZA! FROM ILECO III FAMILY! National Electrification Administration https://www.facebook.com/watch/?v=1176753016222117 Read more

  • NAGABATON SANG APLIKASYON SANG ELECTRIC SERVICE ANG SARA AREA OFFICE PARA SA BANWA SANG SARA, LEMERY, AJUY, CONCEPCION KAG SAN DIONISIO

    SA TANAN NGA MGA MIYEMBRO-KONSUMIDORES SANG ILECO III: Ang Sara Area Office nga nahamtang sa Brgy. Preciosa, Sara ang naga-baton sang aplikasyon sang electric service sa tanan nga luyag mag-patakod sang kuryente nagikan sa banwa sang Sara, Lemery, Ajuy, Concepcion kag San Dionisio. Ang Pre-Membership Seminar ang ginapatigayon kada Martes kag Huwebes humalin alas 8:00… Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more