• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 8, 2023)

    Date: November 8, 2023 (Wednesday) Time of interruption: 11:10 AM Estimated time of restoration: 1:25 PM Affected area/s: Proper, Brgy. Bagacay, San Rafael Activity: Inspection and replaced damaged transformer We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 8, 2023)

    Date: November 8, 2023 (Wednesday) Time of interruption: 7:44 AM Estimated time of restoration: 8:50 AM Affected area/s: Brgy. Dapdapan and Cabantohan, Lemery Activity: Inspection/repaired sectionalizing cut-out of Phase C located at Brgy. Arante and replaced busted fuse link due to heavy rain and lightning surge We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 8, 2023)

    Date: November 8, 2023 (Wednesday) Time of interruption: 12:05 NN Estimated time of restoration: 1:27 PM Affected area/s: Brgy. Ferraris, Sara Activity: Inspection/repaired sectionalizing cut-out and replaced busted fuse link and fuse tube at Brgy. Ferraris, Sara due to Phase C trip-off. We apologize for the inconvenience. For your information. Read more

  • ILECO III TRIVIA FACT #2

    Ang ILOILO III ELECTRIC COOPERATIVE, INC. na-organized sang June 30, 1986 bilang isa ka Non-Stock, Non-Profit cooperative sandig sa Presidential Decree No. 269 nga gin-pirmahan sang anay Presidente Ferdinand Marcos Sr. #IbaAngMayAlam#ILECOIII@36 Read more

  • ILECO III OFFICES, AREA COVERAGE AND CONTACT INFORMATION

    Read more

  • ILECO III Trivia Fact #1

    Si ATTY. JAMES G. BALSOMO II ang bag – o nga nagadumala bilang isa ka General Manager ni ILECO III. Read more

  • MAG-INTRA KAG MAGDA-UG SANG 200 PESOS CELLPHONE LOAD!

    IKAW BALA ISA KA MEMBER-CONSUMER-OWNER (MCO) SANG ILECO III? MAG-INTRA KAG MAGDA-UG SANG 200 PESOS CELLPHONE LOAD!Kabahin sang pagsa-ulog sang aton Kooperatiba sang ika-36 nga Foundation Celebration sa bulan sang Setyembre, ang ILECO III ang maga-post sang mga informational videos, infographics kag iban pa nga information materials parte sa aton Kooperatiba. Sa diri nga mga… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more