• UNSCHEDULED POWER INTERRUPTION (APRIL 12, 2023)

    Date: April 12, 2023 Time of interruption: 6:15 PM Time of restoration: 7:06 PM Affected area: Sitio Tacayay, San Florentino, San Rafael, Iloilo Cause: Line fault due to vegetation (coconut leaves) We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (APRIL 12, 2023)

    Date: April 12, 2023 Time of interruption: 9:45 AM Estimated time of restoration: NOT YET DETERMINED Affected areas: Calapdan, Lonoy and Lumbia, Estancia, Iloilo Cause: Line fault due to vegetation (bamboo) We apologize for the inconvenience. For your information. Read more

  • CANCELLED ANG SCHEDULED POWER INTERRUPTION SA ABRIL 14 KAG 15, 2023 SA ISLA GIGANTES

    Pahibalo sa mga katapo-konsumidores nga GIN-CANCEL ang SCHEDULED POWER INTERRUPTION sang ILECO III para sa pag-patigayon sang technical activities. Ang petsa, oras kag lugar nga apektado sang sini nga CANCELLED power interruptions sa banwa sang CARLES amo ang masunod: ABRIL 14, 2023 (BIYERNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon)• Brgy. Gabi• Brgy. Lantangan… Read more

  • NEA-EC SIMULTANEOUS TREE PLANTING ACTIVITY

    ILECO III joins the NEA-EC Simultaneous Tree Planting Activity in line with 2022 celebration of National Electrification Awareness Month (NEAM)Location: So. Bakahan, Brgy. Del Castillo, Sara Date: August 26, 2022 https://www.facebook.com/watch/?v=394788452802587 Read more

  • SENIOR CITIZEN DISCOUNT

    Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III:• Valid Senior… Read more

  • ILECO III Trivia Fact #4

    ANTI-OBSTRUCTION OF POWER LINES ACT (RA 11361) An Act ensuring the continuous and uninterrupted transmission and distribution of electricity and protection of the integrity and reliability of power lines, and providing penalties for violations thereof. Read more

  • ILECO III Trivia Fact #3

    ANTI-PILFERAGE ACT (REPUBLIC ACT 7832) ukon ang Anti – Electricity and Electric Transmission Lines/Materials Pilferage Act of 1994. Sa bahin sang mga electric cooperatives kag iban nga distribution utilities, ini ang nagahatag sang multa sang multa sa mga madakpan nga nagapangawat sang kuryente. Read more

  • ITB 2404, S. 2024

    Refurbishment of Roofing, Glass Counters and Repainting of Sara Area Office. Read more

  • ITB 2403, S. 2024

    Procurement and Supply of Six (6) Units Service Vehicle for Maintenance Use in Area Offices. Read more

  • ITB 2402, S. 2024

    Procurement of Materials for Maintenance, Rehabilitation, Revamp of Lines and Capital Expenditures Read more