
POWER RATES
POWER ADVISORIES
Date: August 04, 2022 Time of interruption: 10:40 AM Time of restoration: 1:49 PM Affected area: Sitio Pang-pang, San Carlos, Anilao Activity: Replaced rotten pole, line clearing and rehab of affected kwhr meters We apologize for the inconvenience. For your information. Read more
Date: August 04, 2022 Time of interruption: 8:19 AM Time of restoration: 9:35 AM Affected area: Gimamanay and Zaragosa, Balasan Activity: Repaired jumper cut-out We apologize for the inconvenience. For your information. Read more
Date: August 04, 2022 (Thursday) Time of interruption: 6:11 AM Time of restoration: 8:25 AM Affected area: Sta. Ana, Batad (portion) and Tingui-an, Balasan Activity: Pulled out animal (bat) from primary line and repair secondary bushing of transformer loose connection We apologize for the inconvenience. For your information. Read more
NEWS AND UPDATES
Iloilo III Electric Cooperative, Inc. together with all 121 Electric Cooperatives in the Philippines celebrates National Cooperatives Month 2022 with the theme “KoopPinas: Nagkakaisang Lakas Para sa Makabuluhan at Sama-samang Pag-unlad!” Read more
Ano ang apat (4) ka kabanwahanan nga nasakupan sang Pani-an Area Office (PAO)? In any order Read more
Maghatag sang lima (5) ka banwa nga nasakupan sang Sara Area Office (SAO). Read more
Ang apat (4) ka banwa nga yara sa area coverage sang Natividad Area Office ukon (NAO) amo ang mga masunod: AnilaoBanateBarotac ViejoSan Rafael Read more
BIDS AND NOTICES
Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loand, and Maintenance Use Read more
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more