
POWER RATES
POWER ADVISORIES
ILECO III Technical personnel conducted reconnection of pulled out kWhr Meter at Sitio Ansag, Poblacion Sur, Balasan today, August 22, 2022 (Monday). Keep safe Warriors of Light For your information. Read more
Date: August 22, 2022 Time of interruption: 11:06 AM Time of Restoration: 1:45 PM Affected Area: Rizal St., Poblacion, Barotac Viejo Activity: Repair tranformer secondary bushing We apologize for the inconvenience. For your information. Read more
ILECO III Technical personnel conducted energization of Three (3) – 50 kVa Transformer at Ajuy National High School for Secondary Metering today, August 22, 2022 (Monday). Keep safe Warriors of Light For your information. Read more
NEWS AND UPDATES
Iloilo III Electric Cooperative, Inc. together with all 121 Electric Cooperatives in the Philippines celebrates National Cooperatives Month 2022 with the theme “KoopPinas: Nagkakaisang Lakas Para sa Makabuluhan at Sama-samang Pag-unlad!” Read more
Ano ang apat (4) ka kabanwahanan nga nasakupan sang Pani-an Area Office (PAO)? In any order Read more
Maghatag sang lima (5) ka banwa nga nasakupan sang Sara Area Office (SAO). Read more
Ang apat (4) ka banwa nga yara sa area coverage sang Natividad Area Office ukon (NAO) amo ang mga masunod: AnilaoBanateBarotac ViejoSan Rafael Read more
BIDS AND NOTICES
15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more
Procurement of Boom Truck Read more