• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 11, 2022)

    Date: November 11, 2022Time of interruption: 3:33 PMTime of Restoration: 4:41 PM Cause of interruption: Line fault due to damaged pin insulator in front of PET Gasoline Station Affected areas: Brgy. Aspera, Brgy. Antonio Yusay and Brgy. Poblacion Ilaya, Sara, Iloilo We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 11, 2022)

    Date: November 11, 2022Time of interruption: 10:05 AMTime of Restoration: 10:44 AM Cause of interruption: Transient line fault Affected areas: Brgy. Aspera, Brgy. Antonio Yusay and Brgy. Poblacion Ilaya, Sara, Iloilo We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 9, 2022)

    Date: November 9, 2022 Time of interruption: 6:40 PM Time of Restoration: 7:45 PM Affected Area: Villahermosa, Sara, Cabantohan, Dapdapan, Omio, Marapal, Alcantara, Yawyawan, Layog Bato and Sitio Talaytay, Poblacion, Lemery Activity: Duplex wire contacted primary line due to vehicular incident in Brgy. Arante, Sara We apologize for the inconvenience. For your information. Read more

  • NATIONAL COOPERATIVES MONTH

    Iloilo III Electric Cooperative, Inc. together with all 121 Electric Cooperatives in the Philippines celebrates National Cooperatives Month 2022 with the theme “KoopPinas: Nagkakaisang Lakas Para sa Makabuluhan at Sama-samang Pag-unlad!” Read more

  • Trivia Question #9

    Ano ang apat (4) ka kabanwahanan nga nasakupan sang Pani-an Area Office (PAO)? In any order Read more

  • Trivia Question #8

    Maghatag sang lima (5) ka banwa nga nasakupan sang Sara Area Office (SAO). Read more

  • ILECO III Trivia Fact#16

    Ang apat (4) ka banwa nga yara sa area coverage sang Natividad Area Office ukon (NAO) amo ang mga masunod: AnilaoBanateBarotac ViejoSan Rafael Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more