• UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 13, 2022)

    Date: September 13, 2022 Time of interruption: 3:35 PM Time of Restoration: 4:45 PM Affected Area: Area from Dugman – Canas, San Dionisio Activity: Inspection of line and replaced fuselink We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 13, 2022)

    Date: September 13, 2022 Time of interruption: 3:35 PM Time of Restoration: 4:56 PM Affected Area: Sitio Lampuyang and Sitio Danmar, Sitio Puros and Sitio Baculod, Libertad, Banate Activity: Inspection and clearing of lines due to vegetation. We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 12, 2022)

    Date: September 12, 2022 Time of interruption: 9:38 AM Time of Restoration: 5:00 PM Affected Area: Brgy. Moto, San Dionisio Activity: Replacement and relocation of rotten poles (2) structure. Installation and rehabilitation of SDI and kWhr Meter in cooperation with our third party contractor (NIGSECO). We apologize for the inconvenience. For your information. Read more

  • NATIONAL COOPERATIVES MONTH

    Iloilo III Electric Cooperative, Inc. together with all 121 Electric Cooperatives in the Philippines celebrates National Cooperatives Month 2022 with the theme “KoopPinas: Nagkakaisang Lakas Para sa Makabuluhan at Sama-samang Pag-unlad!” Read more

  • Trivia Question #9

    Ano ang apat (4) ka kabanwahanan nga nasakupan sang Pani-an Area Office (PAO)? In any order Read more

  • Trivia Question #8

    Maghatag sang lima (5) ka banwa nga nasakupan sang Sara Area Office (SAO). Read more

  • ILECO III Trivia Fact#16

    Ang apat (4) ka banwa nga yara sa area coverage sang Natividad Area Office ukon (NAO) amo ang mga masunod: AnilaoBanateBarotac ViejoSan Rafael Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more