
POWER RATES
POWER ADVISORIES
RESCHEDULED POWER INTERRUPTION Pahibalo sa mga katapo-konsumidores nga ang PREVENTIVE MAINTENANCE sang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Sara-Estancia Transmission Line Section sa AGOSTO 05, 2023 (SABADO) ang GIN-RESCHEDULED sa AGOSTO 06, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: 5:00 AM- 6:00 AM (1… Read more
Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE kag LOAD TRANSFER ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69 kV Sara-Estancia Transmission Line Section sa AGOSTO 05, 2023 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: 5:00 AM- 6:00 AM (1 ka oras… Read more
Date: August 31, 2023 (Thursday) Time of interruption: 5:28 AM Time of Restored: 5:49 AM Activity: Inspection of line and replaced busted fuse link Affected areas: PedreƱa St., Poblacion, Balasan We apologize for the inconvenience. For your information. Read more
NEWS AND UPDATES
Kabahin sang ginpatuman nga desentralisasyon sa pagbaton sang bag-o nga aplikasyon para sa serbisyo sang kuryente umpisa subong nga Nobyembre 14, 2022, ang ILOILO III ELECTRIC COOPERATIVE, INC. nagapahibalo nga ang Pre-Membership Seminar ukon PMS para sa luyag magpa-miyembro kag magpatakod sang kuryente ang pagahiwaton na sa mga malapit nga talatapan sang aton kooperatiba nga… Read more
For your information. Read more
ILOILO III ELECTRIC COOPERATIVE, INC. joins our Member-Consumer-Owners in remembering our Saints and Souls departed. Let us pray, Eternal rest rest grant unto them O Lord and Let perpetual light shine upon them. Read more
Despite of the bad weather and heavy rains due to Typhoon Paeng, the Medical Mission was held at ILECO III Covered Gym on Friday, October 28, 2022. It was spearheaded by our General Manager Atty. James G. Balsomo II with ILECO III personnel. This activity aims to help our Member-Consumer-Owners (MCOs) and also their family… Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more