• POWER RESTORATION UPDATE

    As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 – Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION (MARCH 1, 2024 UPDATE as of 11:30 PM)

    With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION (MARCH 1, 2024 UPDATE as of 10:12 PM)

    With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting Read more

  • NOTICE TO THE PUBLIC OFFICE SCHEDULE

    JANUARY 29, 2025 – CHINESE NEW YEAR MAIN OFFICE – CLOSED AREA OFFICES – CLOSED REGULAR OFFICE HOUR WILL RESUME ON JANUARY 30, 2025 (THURSDAY) May ara man sa gihapon nga assigned on duty maintenance crew sa Coverage Area sang ILECO III para sa pag-responde sa inyo nga mga complaints. Madamo gid nga salamat sa Read more

  • POWER BILL KAG RATE COMPOSITION

    Ka MCO! Aton hibalu-on ang Power Bill kag Rate Composition nga aton makita sa aton Power Bill kada bulan. Diin bala naga-kadto ang aton ginabayaran sa aton kuryente? Matuod gid man bala ang tsismis nga ang isa ka Electric Cooperative ang nagapa-gusto lang sa pag-pasaka sang kuryente? Diri naton mahibaluan kung fixed bala ang Distribution, Read more

  • ENERGY CONSERVATION TIPS

    Ka-MCO! Looking for ways to save energy and money at home? Take a look at these Energy Conservation Tips we have put together, they could help you in reducing your monthly bills. Iba ang may alam ka-MCO! Info is Power! Read more

  • IMPLEMENTASYON SANG Php387M ESTANCIA-MANLOT-CALAGNA-AN-SICOGON ISLANDS SUBMARINE CABLE INTERCONNECTION PROJECT, GIN-UMPISAHAN NA!

    Ginsuguran na ang construction sang linya sa pag-implementar sang Php387M Estancia-Manlot-Calagna-an-Sicogon Islands Submarine Cable Interconnection Project. Sa nahibalua-an, ini ang makabig nga pinakadaku nga rural electrification project sang Department of Energy-Total Electrification Program (DOE-REP) nga makabenepisyo sang masobra 13,000 ka mga panimalay sa nasambit nga isla base sa datus sang Philippine Statistics Authority (PSA). Ini Read more

  • ITB 2407, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more

  • ITB 2406, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more

  • ITB 2405, S. 2024

    Invitation to Bid for the Design, Supply, Delivery, Installation, Testing and Commissioning of Three-Phase Submarine Line Cable from Brgy. Daculan, Estancia to Brgy. Manlot, Carles, from Brgy. Manlot to Brgy. Talingting, Carles and from Brgy. Punta Batuanan to Brgy. San Fernando, Carles, Iloilo (Turn Key) Read more