• SUPPLEMENTAL POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga KANSELADO ukon INDI MADAYON ang power interruption sa ENERO 27, 2024 (SABADO), 6:00 AM- 4:00 PM (10 ka oras ang kalawigon) para sa pag-clearing sang linya kag pag-ilis sang mga poste kag cross-arms. Ang lugar nga apektado sang sini nga power interruption amo ang masunod:• TANAN NGA BARANGAY SA ANILAO•… Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 24, 2024)

    Date: January 24, 2024 Time of interruption: 10:45 AM Time of power restoration: 11:23 AM Affected areas: NHA Village Site 1, Nalumsan, Carles, Iloilo Activity: Repaired transformer supply and jumper loose connection For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 24, 2024)

    Date: January 24, 2024 Time of interruption: 6:43 AM Time of power restoration: 8:46 AM Affected areas: Bolo, Tupaz, Cabuguana, Bancal (portion), Poblacion, Carles, Iloilo Activity: Replaced damage assembly fuse cut-out in Balantian, Balasan For your information. Read more

  • ENERGY CONSERVATION TIPS!

    REFRIGERATOR Repair refrigerator door seals if you feel cold air around the closed door or if moisture is collecting.Clean the condenser tube regularly.Minimize door openings as much as possible. Cool air escapes every time the refrigerator is opened.Buy ref with Energy Efficient Factor and preferably one with an inventer technology.Replaced old refrigerators.Reference:100 ways to save… Read more

  • ILECO III CONTACT INFORMATION

    Read more

  • FOLLOW AND LIKE THE ILECO III OFFICIAL FB PAGE

    Please follow and like the official Facebook page of ILECO III to know the latest power advisories, coop activities and other concerns related to electric service. Thank you! Read more

  • BAPA JOINT MEETING IN BRGY. TALOKGANGAN, BANATE

    LOOK: ILECO III personnel conducted BAPA Joint Meeting held at Tito Paps, Brgy. Talokgangan, Banate with 131 Attendees from different BAPA Association from Natividad Area Coverage last January 11, 2023 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more