
POWER RATES
POWER ADVISORIES
Time of interruption: 6:28 p.m.Estimated time of restoration: Not yet determined Affected Areas: Municipalities of ANILAO, BANATE, BAROTAC VIEJO and SAN RAFAEL Cause of interruption: Load shedding of the transmission provider, National Grid Corporation of the Philippines (NGCP) Our Technical Team is closely coordinating with NGCP for the updates and estimated time of power restoration.… Read more
Time of interruption: 1:28 p.m.Estimated time of restoration: Not yet determined Affected Areas (ILECO III): Municipalities of ANILAO, BANATE, BAROTAC VIEJO, SAN RAFAEL, SARA, SAN DIONISIO, CONCEPCION, AJUY, LEMERY, BATAD, ESTANCIA, BALASAN, and CARLES Cause of interruption: High system voltage of Panay Grid transmission line operated by the National Grid Corporation of the Philippines (NGCP)… Read more
For your information. Read more
NEWS AND UPDATES
REFRIGERATOR Repair refrigerator door seals if you feel cold air around the closed door or if moisture is collecting.Clean the condenser tube regularly.Minimize door openings as much as possible. Cool air escapes every time the refrigerator is opened.Buy ref with Energy Efficient Factor and preferably one with an inventer technology.Replaced old refrigerators.Reference:100 ways to save… Read more
Please follow and like the official Facebook page of ILECO III to know the latest power advisories, coop activities and other concerns related to electric service. Thank you! Read more
LOOK: ILECO III personnel conducted BAPA Joint Meeting held at Tito Paps, Brgy. Talokgangan, Banate with 131 Attendees from different BAPA Association from Natividad Area Coverage last January 11, 2023 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This… Read more
BIDS AND NOTICES
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Poles Read more