• NGCP’s OFFICIAL STATEMENT ON THE RECENT UNSCHEDULED POWER INTERRUPTION

    Official statement from the transmission provider, NGCP, on the recent unscheduled power interruption affecting the whole Panay and Guimaras islands. For your information, thank you. https://www.facebook.com/NGCPph/posts/pfbid035v2o5ektGtbx4Kyehe8vDEJ7UTw4L9JwP3BMqQM3ZixccBTTH3QTBcufzJaVbvoBl Read more

  • UNSCHEDULED NGCP POWER INTERRUPTION (FEBRUARY 20, 2023)

    Time of interruption: 11:10 a.m.Estimated time of restoration: Not yet determined Affected areas (ILECO III): Municipalities of ANILAO, BANATE, BAROTAC VIEJO, SAN RAFAEL, AJUY, SARA, LEMERY, CONCEPCION, SAN DIONISIO, BATAD, ESTANCIA, BALASAN and CARLES(Affected areas of this NGCP unscheduled power interruption are the entire islands of PANAY and GUIMARAS). Cause of power interruption: High system… Read more

  • UNSCHEDULED POWER INTERRUPTION (FEBRUARY 18, 2023)

    Date: February 18, 2023 Time of interruption: 6:15 PM Time of restoration: 7:17 PM Affected area: Brgy. Calaigang, San Rafael Cause of Interruption: Transformer secondary jumper cut-off We apologize for the inconvenience. For your information. Read more

  • ENERGY CONSERVATION TIPS!

    REFRIGERATOR Repair refrigerator door seals if you feel cold air around the closed door or if moisture is collecting.Clean the condenser tube regularly.Minimize door openings as much as possible. Cool air escapes every time the refrigerator is opened.Buy ref with Energy Efficient Factor and preferably one with an inventer technology.Replaced old refrigerators.Reference:100 ways to save… Read more

  • ILECO III CONTACT INFORMATION

    Read more

  • FOLLOW AND LIKE THE ILECO III OFFICIAL FB PAGE

    Please follow and like the official Facebook page of ILECO III to know the latest power advisories, coop activities and other concerns related to electric service. Thank you! Read more

  • BAPA JOINT MEETING IN BRGY. TALOKGANGAN, BANATE

    LOOK: ILECO III personnel conducted BAPA Joint Meeting held at Tito Paps, Brgy. Talokgangan, Banate with 131 Attendees from different BAPA Association from Natividad Area Coverage last January 11, 2023 (Wednesday). This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more