• UNSCHEDULED POWER INTERRUPTION (APRIL 26, 2022)

    Date: April 26, 2022 (Tuesday) Time of interruption: 6:15 PM Time of restoration: 7:00 PM Affected area: Quiazan Florete, Batad, Iloilo Cause of interruption: Line fault due to vegetation We apologize for the inconvenience. For your information. Read more

  • LINE CORRECTION IN SITIO FACUMA, PADIOS, SARA

    ILECO III Technical Team conducted line correction in Sitio Facuma, Padios, Sara, Iloilo on April 26, 2022 (Tuesday). For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (APRIL 25, 2022)

    Date: April 25, 2022 (Monday) Time of interruption: 8:22 PM Time of restoration: 8:44 PM Affected area: Bayuyan and San Roque, Estancia, Iloilo Activities: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • ILECO III ELECTRICITY RATES

    PRESS RELEASE Pahibalo sa mga Katapu-Kunsomidores sang ILECO III nga nagnubo na sang masobra 2 pesos/kwhr ang presyo sang kuryente sang ILECO III halin Nobyembre 2022 – Enero 2023 NOBYEMBRE – 14.6963 pesos/kwhrDISYEMBRE – 13.5551 pesos/kwhrENERO – 12.6897 pesos/kwhr Read more

  • ILECO III ENERGY SAVING TIP

    Kuhaon sa saksakan ang mga appliances nga wala ginagamit. Read more

  • LIVE INTERVIEW WITH ILECO III MANAGEMENT COMMITTEE

    Please watch to know more about ILECO III’s operation and other activities https://www.facebook.com/ILECO3/posts/pfbid02aoBoNn7RMA2vxFyJkdfgsPkrH5aR4919Qp23Vi31HokegyARmzYrmHN4JWQ8NJeFl Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more