
POWER RATES
POWER ADVISORIES
Date: August 25, 2023 (Friday) Time of interruption: 7:10 AM Time of restoration: 8:00 AM Affected areas: Salong, Batad Action Taken: Inspection of primary line, pull-out animal contact (bird) and replaced busted fuse link We apologize for the inconvenience. For your information. Read more
Date: August 25, 2023 (Friday) Time of interruption: 10:55 AM Time of restoration: 11:28 AM Affected areas: Gomez St., Poblacion, Carles Action Taken: Inspection of secondary line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more
Date: August 25, 2023 (Friday) Time of interruption: 4:04 AM Time of restoration: 9:31 AM Affected areas: C. Pedrana and S. Ganzon St., Poblacion, Balasan Action Taken: Repaired connection and repaired two (2) pieces damaged transformer bushing We apologize for the inconvenience. For your information. Read more
NEWS AND UPDATES
Ginapahanumdom ang tanan nga katapo-konsumidores nga sa mga hilikuton kaangay sang Battle of the Sounds, Barangay Fiesta kag pagpatigayon sang welding operations sa mga construction sang puluy-an, buluthu-an kag iban pa nga istruktura nga ginapanugyan gid nga magpatakod sang private ukon kaugalingon nga transformer base sa rekomendasyon sang aton kooperatiba. Ini sandig sa Coop Policy… Read more
PRESS RELEASE Pahibalo sa mga Katapu-Kunsomidores sang ILECO III nga nagnubo na sang masobra 2 pesos/kwhr ang presyo sang kuryente sang ILECO III halin Nobyembre 2022 – Enero 2023 NOBYEMBRE – 14.6963 pesos/kwhrDISYEMBRE – 13.5551 pesos/kwhrENERO – 12.6897 pesos/kwhr Read more
Kuhaon sa saksakan ang mga appliances nga wala ginagamit. Read more
Please watch to know more about ILECO III’s operation and other activities https://www.facebook.com/ILECO3/posts/pfbid02aoBoNn7RMA2vxFyJkdfgsPkrH5aR4919Qp23Vi31HokegyARmzYrmHN4JWQ8NJeFl Read more
BIDS AND NOTICES