• UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 28, 2023)

    Date: September 28, 2023 (Thursday) Time of interruption: 8:00 AM Estimated time of restoration: 9:42 AM Affected Area/s: Portion of NHA Village, Calapdan, Estancia Activity: Replaced damaged distribution transformer (25kVA) We apologize for the inconvenience. For your information. Read more

  • MAY SCHEDULED PREVENTIVE MAINTENANCE ANG NGCP SA OKTUBRE 1, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREMENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50 MVA Transformer No. 1 sa Concepcion Substation sa OKTUBRE 01, 2023 (DOMINGO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: OKTUBRE 01, 2023 (DOMINGO)5:00 AM- 7:00 AM (2… Read more

  • SCHEDULED POWER INTERRUPTIONS SA OKTUBRE 2-3, 5, KAG 11-13, 2023 SA BANWA SANG CARLES

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang CARLES amo ang masunod: OKTUBRE 02, 2023 (LUNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon) • Binuluangan• Tabugon OKTUBRE 03, 2023 (MARTES)8:00… Read more

  • NOTICE TO THE PUBLIC

    Ginapahanumdom ang tanan nga katapo-konsumidores nga sa mga hilikuton kaangay sang Battle of the Sounds, Barangay Fiesta kag pagpatigayon sang welding operations sa mga construction sang puluy-an, buluthu-an kag iban pa nga istruktura nga ginapanugyan gid nga magpatakod sang private ukon kaugalingon nga transformer base sa rekomendasyon sang aton kooperatiba. Ini sandig sa Coop Policy… Read more

  • ILECO III ELECTRICITY RATES

    PRESS RELEASE Pahibalo sa mga Katapu-Kunsomidores sang ILECO III nga nagnubo na sang masobra 2 pesos/kwhr ang presyo sang kuryente sang ILECO III halin Nobyembre 2022 – Enero 2023 NOBYEMBRE – 14.6963 pesos/kwhrDISYEMBRE – 13.5551 pesos/kwhrENERO – 12.6897 pesos/kwhr Read more

  • ILECO III ENERGY SAVING TIP

    Kuhaon sa saksakan ang mga appliances nga wala ginagamit. Read more

  • LIVE INTERVIEW WITH ILECO III MANAGEMENT COMMITTEE

    Please watch to know more about ILECO III’s operation and other activities https://www.facebook.com/ILECO3/posts/pfbid02aoBoNn7RMA2vxFyJkdfgsPkrH5aR4919Qp23Vi31HokegyARmzYrmHN4JWQ8NJeFl Read more

  • ITB 2407, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Five (5) Barangays (Brgy. Barangcalan, Brgy. Bito-on, Brgy. Talingting, Brgy. Tinigban, and Brgy. Punta Batuanan) in Calagnaan Island, Carles, Iloilo (Turn Key) Read more

  • ITB 2406, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials from Brgy. Poblacion to Brgy. Daculan, Estancia and Brgy. Manlot, Manlot Island, Carles, Iloilo(Turn Key) Read more

  • ITB 2405, S. 2024

    Invitation to Bid for the Design, Supply, Delivery, Installation, Testing and Commissioning of Three-Phase Submarine Line Cable from Brgy. Daculan, Estancia to Brgy. Manlot, Carles, from Brgy. Manlot to Brgy. Talingting, Carles and from Brgy. Punta Batuanan to Brgy. San Fernando, Carles, Iloilo (Turn Key) Read more